DESCRIBED BY COAST AND GEODETIC SURVEY 1954 AT AKRON, ALONG THE BALTIMORE AND OHIO RAILROAD, NEAR THE UNION STATION, AT THE OVERPASS OF CENTER STREET OVER TRACKS, SET VERTICALLY IN THE NORTHWEST FACE OF THE CONCRETE BASE OF THE SOUTHWEST MOST LEG OF THE FIRST PIER SOUTHEAST OF TRACKS, 22 1/2 FEET SOUTHEAST OF SOUTHEAST RAIL OF EXTREME SOUTHEAST TRACK, 192 FEET NORTHEAST OF NORTH CORNER OF UNION STATION, 2 FEET NORTHEAST OF WEST CORNER OF CONCRETE BASE AND 2 1/2 FEET ABOVE GROUND. RECOVERY NOTE BY NATIONAL GEODETIC SURVEY 1963 RECOVERED AS DESCRIBED. 2013-NEW BRIDGE AND PIERS